Truck with a tail lift
For deliveries to installers, shops and sites with no forklift. Heavy packages come down under control instead of rolling.
Transport types
FTL — full truck load Groupage & LTL ADR — dangerous goods Refrigerated transport Oversized & project cargo All servicesRoutes
Romania → Germany Romania → Italy Romania → France Romania → Spain Romania → Poland Romania → Czechia Domestic transport, Romania Romania → Morocco All routesIndustries
Pharma & medical devices Automotive Metals & metalworking Building materials & finishes FMCG & packaged food Retail & e-commerce Industrial chemicals & ADR Energy & heating equipment Agriculture & inputs All industriesHeating equipment is an awkward combination: heavy per package, fragile to vibration and almost always tied to an installation date. A scratched boiler can still be fitted; a PV panel with micro-cracks does not show it is broken until the output drops. So the securing is discussed before loading, not improvised at the dock.
For deliveries to installers, shops and sites with no forklift. Heavy packages come down under control instead of rolling.
For large volumes between depots, secured in rows and with dividers.
For industrial boilers, tanks and equipment beyond standard dimensions.
For electronics, controls and spare parts sensitive to damp.
The papers below are the ones I ask for or check myself before loading. If you are missing one, tell me at the start and we will sort it out.
The basic document. I fill it in; you sign at loading.
Matching the goods actually loaded.
Weight, dimensions and transport position. Without it, the securing is done by eye — and on heavy equipment that shows at destination.
Only for equipment beyond the legal dimensions. Obtained beforehand, not on the day of loading.
Romania → Germany
Transit 48–72h
See the routeRomania → Italy
Transit 48–60h
See the routeRomania → France
Transit 72–96h
See the routeRomania → Spain
Transit 96–120h
See the routeRomania → Poland
Transit 36–48h
See the routeRomania → Czechia
Transit 36–48h
See the routeDomestic transport, Romania
Transit 12–24h
See the routeRomania → Morocco
Transit 7–10 days
See the routeIn the manufacturer's original packaging, on edge and not laid flat on top of each other, with the pallet secured so it cannot move under braking. Micro-cracks are invisible to the eye and come precisely from vibration on the road, so the securing matters more than the speed.
Yes, but beyond the legal dimensions it becomes oversized transport: route permits, possibly escort, and a route survey. Send me the real dimensions and the weight and I will tell you up front what lead time and what cost that means.
Yes, with a tail lift truck. Tell me whether there is truck access at the address and whether unloading happens at the kerb or in the yard, because both change the choice of truck.
It takes under a minute to fill in, or you can just call me. I check availability with carriers and come back with a firm quote, with no hidden costs at unloading.
Cookies on this site
I use strictly necessary cookies so the forms work — those need no consent. For traffic measurement and marketing I ask your permission. You can refuse without losing anything on the site. Details.
Choose what you accept. You can change your mind at any time, from the footer.
Strictly necessary
They remember your session and protect the forms against fraud. Without them you cannot send a quote request. They track nothing.
Analytics
They measure anonymously which pages are read and where visitors come from, so the site can be improved. They are not used for advertising.
Marketing
They allow campaigns to be measured and relevant ads to be shown on other sites.
Read the cookie policy.